Execute the improve phase of the Six Sigma DMAIC project including the following:
Execute the control phase of the Six Sigma DMAIC project including the following:
Utilize all analytical tools available for Six Sigma as permitted or appropriate including, but not limited to: flowcharts, run charts, Pareto charts, checksheets, cause-and-effect diagrams, opportunity flow diagram, process control charts, failure mode and effect analysis (FMEA), design of experiments (DOE) and lean tools. Students can use templates located in the text or online sources.
Write a 1500 – 2000 word APA paper to describe your Analyze,
Improve, and Control phases.
Click the Assignment Files tab to submit your assignment.
Note: Grades are awarded based upon individual contributions to the Learning Team assignment. Each Learning Team member receives a grade based upon his/her contributions to the team assignment. Not all students may receive the same grade for the team assignment.
Note: Congratulations! You all have now been exposed to Phase II what is required for Yellow Belt training.